,

BIS Standards as applicable on Solar Modules in India

BIS Standards as applicable on Solar Modules in India
BORN IN INDIA I SERVED FROM INDIA I TO THE GLOBE

Dated: 31.05.2022

BIS Standards on Solar Modules in India

 

The Ministry of New and Renewable Energy (MNRE) has implemented a Quality Control Order on SPV Systems, Devices and Components Goods Order 2017 under BIS Act(Compulsory Registration Scheme). The said order includes SPV Modules, Inverter and Battery Storage with specified Indian Standards adopted from IEC Standards for these products.

The Experts Committee made recommendation to make two separate Indian Standards for Crystalline and Thin Film based Modules by combining related standards, including the standard on PID Test for crystalline modules, and implementation of revised standard on inverter as follows-

 

Sl No Product Standards Remarks
1 Solar PV Modules (Crystalline) IS 14286-1:2019/IEC 61215-1: 2016 * Since IS IEC 61730-2 refers Fire test MST 23 as National/Local code we need to mandate this test in IS IEC 61730-2Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β Β  * As per IS 17210 test duration for PID is 96Hrs (Chamber method) and 168Hrs (Ambient method). However, requirement from MNRE is 288Hrs, which may be incorporated.
IS 14286-2: 2019/IEC 61215-2: 2016
IS 14286-1-1: 2019/IEC 61215-1-1: 2016
IS/IEC 61730-1: 2016
IS/IEC 61730-2: 2016
IS 17210-1: 2019/IEC TS 62804-1: 2015
2 Solar PV Modules (Thin film) IS 14286- 1-Sec 2: 2019/IEC 51215-1-2: 2016 * Since IS IEC 61730-2 refers. Fire test MST 23 as National/ Local code we need to mandate this test in IS IEC 61730-2
IS 14286-1-Sec 3: 2019/IEC 61215Β­1-3: 2016
IS 14286-1-Sec 4: 2019/IEC 61215- 1-4; 2016
IS 14286-1: 2019/IEC 61215-1: 2016
IS 14286-2: 2019/IEC 61215-2: 2016
IS/IEC 61730-1: 2016
IS/IEC 61730-2: 2016
3 Inverters IS 16169: 2019/IEC 62116: 2014 The revised standard may be adopted for implementation.
SI No Existing Indian Standard in force Revised Standard Title
i. IS 14286: 2010/ IEC 61215: 2005 15 14286 (Part 1) : 2018/IEC 61215-1 : 2016 Terrestrial photovoltaic PV modules -Design qualification and type approval-Part 1: Test requirements (second revision)
ii.Β Β Β Β Β Β Β Β Β Β Β Β  Β  IS 14286 (Part 2): 2018/IEC 61215-2 : 2016 Terrestrial photovoltaic PV modules -Design qualification and type approval-Part 2 Test procedures (second revision)
iii.Β Β Β Β Β Β Β Β Β Β  Β  IS 14286 (Part 1/Sec 1) : 2018/ IEC 61215-1-1: 2016 Terrestrial photovoltaic PV modules -Design qualification and type approval -Part 1: Test requirements – Sec 1 : Special requirements for testing of crystalline silicon photovoltaic PV modules (second revision)
iv.Β Β Β Β Β Β Β Β Β Β Β  Β  IS 16077: 2013/ IEC 61646: 2008 IS 14286 (Part 1/Sec 2) : 2018/ IEC 61215-1-2 : 2016 Terrestrial photovoltaic PV modules -Design qualification and type approvalΒ­ Part 1 : Test requirements – Sec 2 Special requirements for testing of thin – Film cadmium telluride CdTe based photovoltaic PV modules (second revision)
v.Β Β Β Β Β Β Β Β Β Β Β Β Β  Β  IS 14286 (Part 1/Sec 3) : 2018/ IEC 61215-1 -3 : 2016 Terrestrial photovoltaic PV modules -Design qualification and type approval -Part 1 Test requirements – Sec 3 : Special requirements for testing of thin – Film amorphous silicon based photovoltaic PV modules (second revision)
vi.Β Β Β Β Β Β Β Β Β Β Β  Β  IS 14286 (Part 1/Sec 4) : 2018/ IEC 61215-1-4 : 2016 Terrestrial photovoltaic PV modules -Design qualification and type approval -Part 1 Test requirements – Sec 4: Special requirements for testing of thin – Film Cu In ga S se 2 based photovoltaic PV modules (second revision)
vii.Β Β Β Β Β Β Β Β  Β  IS/IEC 61730 -1: 2004 IS/IEC 61730 – 1 : 2016 Photovoltaic (PV) module safety qualification: Part 1 Requirements for Construction (first revision)
viii.Β Β Β Β Β Β  Β  IS/IEC 61730 – 2 : 2004 IS/ IEC 61730-2 : 2016 Photovoltaic (PV) module safety qualification: Part 1 Requirements for testing (first revision)
IX. IS 16169: 2014/ IEC 62116: 2008 IS 16169: 2018/ IEC 62116 : 2014 Utility-Interconnected photovoltaic inverters-Test procedure of islanding prevention measures (first revision)

 

Feel free to connect with us for any of your BIS approvals with regards to Solar Modules/Inverters or project-based approvals from MNRE.

 

Download the MNRE Circular Below:

MNRE CIRCULAR

 

 

Some of Our Major/Reputed Clients:

  1. Winomechanic Pvt Ltd, Chennai
  2. LSML Pvt Ltd, Chennai
  3. Sun Pharmaceutical Limited, Mumbai
  4. Liberty Shoes Limited, Karnal
  5. Grant Instruments India Pvt Ltd, UK & India
  6. Guangzhou Xiongli Battery Co, Ltd, China
  7. Shanutec Shanghai Electronic Technology Co, Ltd, China
  8. BDO India LLP

 

 

In case you face any issues related to Indirect Tax-Customs, GST, Foreign Trade Policy (FTP), Arbitration matters and Central Licensing and related advisory matters in India then please feel free to get in touch with SJ EXIM Services.Β We offer Legal advice and litigation support in matters related to Indirect Tax-Customs, FTP, other Indirect Tax matters & Arbitration law, all sorts of Central licensing and related matters. Come and explore the new way of doing business with us!

We also offer railway rakes across India at the nearest railway siding of your choice. We Are a registered/authorized resellers for Railway rake bookings. Pls connect for your bookings for Wagon, Mini Rakes (20 wagons), Full rake cargo. Our organization code with Indian Railways is SJEX.

Connect with us

@ Team S J EXIM SERVICES, New Delhi, IN

CP: Ms. Shubhra Jha/+91-9999005693

Web:Β www.sjexim.services

EMAIL: operations@sjexim.services | shubhra@sjexim.services

Facebook:Β Facebook Page

β€œWe Design & Create Solutions for Government, Corporates, MSME & Individuals across Industry Verticals”

Disclaimer:

  1. The views are of the Author based on his/her interpretation of the relevant information/documents, applicable law, and government policy and there is no assurance that a court or tribunal or regulatory body or other governmental authority may not interpret it differently.
  2. We are not responsible for updating or revising this article on account of any change in law or interpretation thereof or a change in events or circumstances informed or occurring after the date of this article unless specifically requested for it.
  3. Our advice should not be taken or used out of context or reproduced for any other purpose or transaction.Β Views expressed in this update are strictly personal, based on our understanding of the underlying law. We are not responsible for any injury, loss or cost arising to any person who refers to this update and acts or refrains from any act accordingly. We would suggest that detailed legal advice must be sought before relying on this update.

NOTE:Β All Inquiries/Pro Bono Consulting/Assignments are solicited via email only & it is a PAID Service only!


Discover more from 𝐒 𝐉 π„π—πˆπŒ π’πžπ«π―π’πœπžπ¬

Subscribe to get the latest posts sent to your email.

Leave a Reply

Let’s connect

← Back

Thank you for your response. ✨

Discover more from 𝐒 𝐉 π„π—πˆπŒ π’πžπ«π―π’πœπžπ¬

Subscribe now to keep reading and get access to the full archive.

Continue reading

Discover more from 𝐒 𝐉 π„π—πˆπŒ π’πžπ«π―π’πœπžπ¬

Subscribe now to keep reading and get access to the full archive.

Continue reading